A sign for the new location of the Tiny Township Administrative Centre at 255 Concession 9 East was installed on Friday, with an anticipated construction completion date of 2027. From left to right: public works director Tim Leitch; Coun. Kelly Helowka; Mayor Dave Evans; Deputy Mayor Sean Miskimins; and CAO Robert Lamb.Derek Howard, Local Journalism Initiative ReporterAdvertisement